Northeast Frontier Railway Time Table from 1st October, 1979
(Klicka för en större bild)

Northeast Frontier Railway Time Table from 1st October, 1979

Includes the Darjeeling-New Jaldaiguri line, list of through coaches, catering tarifs, advertising etc. Ca 100 pages A5.
Artikelnummer:B2867
Enhet:st.
Lagerstatus:
80kr / st.
St:
Skriv ut
Visa stor bild
PDF